Total Assets
4,218
In Use
1,965
Overdue
74
Unassigned
312
Asset lifecycle
Cost & replacement overview
Avg. asset age 3.4 yrs
42 assets approaching end-of-life
Recent Scans
AssetTagLocationByWhen
RONIN TITAN LIFT (TL)TL-1011-11Building A – Storage RackJ. SmithJust now
TerrAdapter Tripod SystemTA-4H-NFPA230100Site C – Main YardK. Lee10 min ago
Ultrastatic 11mm – 200mUB-200-US11Warehouse 2 – Shelf 16M. Davis30 min ago
Maintenance Due
AssetDueAction
TerrAdapter Tripod SystemToday
LECCO STRETCHER 2.0In 3 days
RONIN Lift AscenderIn 1 week
What you get (EZYiD × Scannable)
Tap-to-track
NFC, QR/Barcodes, optional UHF RFID pistol grip.
Digital inspections
Checklists, pass/fail, photos, next due & alerts.
Compliance & audit
Auto audit trail from every scan & inspection.
Assignments
Custody by person/team/site, history preserved.
Spreadsheet import
Migrate from Excel; bulk build inventories fast.
Smart PPE & retrofit
Embedded IDs or add-on NFC/cable-tie tags.
Advanced search
Find by tag, serial, status, location or job.
Mobile-first scans
Use your phone; guns optional for UHF sweeps.
Tip: Click Run inspection to try a realistic flow (scan source → checklist → auto-log).
Automation rules
Overdue → Create maintenance job
When asset becomes overdue
Active
Failed inspection → Quarantine
Auto-lock asset on fail
Active
Wrong site scan → Alert
Notify supervisor
Draft
Assets (filtered)
Name Category Inspection Status Next Inspection Actions
RONIN TITAN LIFT (TL) Powered Ascender Healthy 29 Jan 2026
TerrAdapter Tripod System Rope Access Tool Due Soon 29 Dec 2025
Ultrastatic 11mm – 200m Semi-Static Rope Due 28 Nov 2025
KIT, CSR RIGGING, 13MM CLUTCH Rigging Kit Expired 1 Jun 2025
Integrations & API
REST API Webhooks SSO ERP
Connect iTrackr with external systems and workflows.